论文部分内容阅读
据《世界水》杂志报导,到本年度6月止,尼罗河流域的持续干旱业已迫使埃及阿斯旺水电站的出力降到了其发电容量的50%,超过了前7个月的降低幅度。
According to World Water, the continuing drought in the Nile Valley by June this year has forced Egypt’s Aswan hydropower output to drop to 50% of its generating capacity, surpassing the previous seven months’ drop.