近年来西德虽然设计和制造了一批60万瓩燃褐煤锅炉,但为了满足电力生产的需要,最近西德拔柏葛公司为Wilhelmshaven电站设计了一台72万瓩燃石煤锅炉。该台锅炉是根据1969年投入运行的30万瓩锅炉(图1)来设计的。30万瓩锅炉从投入运行以来已运行了30000小时,其利用率已达到97.3~98%。Wilhelmshaven 电站72万瓩燃石煤锅炉见图2。锅炉蒸汽参数:525/525℃;182
In recent years, although West Germany has designed and manufactured a batch of 600,000 lignite-fired lignite boilers, it recently designed a 720,000 gallon coal-fired boiler for Wilhelmshaven Power Station to meet the needs of power generation. The boiler was designed on the basis of a 300,000 19 boiler which was put into operation in 1969 (Figure 1). The 30,000-kilowatt boiler has been operating for 30,000 hours since it was put into operation, and its utilization rate has reached 97.3-98%. The Wilhelmshaven power plant with 720,000 tons of coal fired boilers is shown in Figure 2. Boiler steam parameters: 525/525 ℃;