论文部分内容阅读
被列入全国四十三座重点病险水库之一的新疆乌鲁木齐乌拉泊水库,在加固除险工程中,采用了槽孔混凝土防渗墙施工工艺,在水库运行的过程中施工,在技术上有一定难度。新疆水利水电勘测设计院地质勘探大队首次参加了这一工程的五个槽段施工,最大槽深达48m,成槽成孔,浇筑经验收均为“优质”。从而为新疆水利水电建设填补了一项空白。预应力锚索工艺,是当代岩土工程的先进技术。新疆水利水电勘测设计院地质钻探队在
The Wula’er reservoir, one of the 43 key reservoirs in the country, is used in the project of reinforcing and eliminating dangers, and the construction technology of slotted concrete cutoff wall is adopted. During the operation of the reservoir, it is technically A certain degree of difficulty. For the first time, the Geological Prospecting Brigade of Xinjiang Water Resources and Hydropower Survey and Design Institute has participated in the construction of the five trough sections of this project. The maximum trough depth is 48 m, the trough into the hole and the pouring experience are both “good quality”. Thus filling a gap for Xinjiang’s water conservancy and hydropower construction. Prestressed anchor cable technology, is the advanced technology of contemporary geotechnical engineering. Xinjiang Water Conservancy and Hydropower Survey and Design Institute geological drilling team at