论文部分内容阅读
大家都知道在水电站建设的工作中,勘测、设计、施工、三者的分工关系是:勘测为设计服务,施工单位是按设计图纸进行施工,因此工程地质和水文地质的勘探工作,是要按具体水工建筑物的意图要求来探清水力枢纽各个建筑物地段的工程地质和水文地质的特性和规律,以作为设计人员考虑相应的工程设施的依据。所以说地质勘探的成果就是水工设计的基础资料,因此倘若地质勘探得出了错误的结论,就有可能导致错误的设计,而最后造成施工上不应有的困难和人民财产的巨大浪费,以下我着重的介绍一下局
We all know that in the construction of hydropower stations, surveying, design and construction, the division of labor between the three is: survey for the design services, construction units according to the design drawings for construction, engineering geology and hydrogeology exploration work is to press The purpose of specific hydraulic construction requirements to explore the various sections of the hydro-junction engineering geology and hydrogeology characteristics and laws as a designer to consider the appropriate basis for the engineering facilities. Therefore, the result of geological exploration is the basic data of hydraulic design. Therefore, if the geological exploration has reached the wrong conclusion, it may lead to wrong design, and finally cause unforeseen construction problems and great waste of people’s property, Below I focus on the game