四川达县青花铁厂于1984年接受省微机办下达的计算机在该厂100m~3高炉上进行生产过程控制的科研项目,于1985年1月与冶金部自动化研究所签订了协议,由该所研制、设计和提供5台微机系统,即热风炉燃烧控制、高炉料柱透气性指数检测、高炉上料程序控制及原料重量补偿、高炉料线检测和高炉数据采集等系统。经研究所和厂方两年多的通力合作,到1987年8月5台微机系统已全部投入运行,其中热风炉燃烧控制和高炉料柱透气性指数检测两台系统,已分别于1986年4月和12月通过了部级技术鉴定。
Sichuan Daxian Qinghua Ironworks in 1984 to accept the provincial computer issued by the computer in the plant 100m ~ 3 blast furnace on the production process control of scientific research projects in January 1985 and the Ministry of Metallurgical Institute of Automation signed an agreement by the Institute Five computer systems were developed, including the control of hot blast stove combustion, the permeability index test of blast furnace column, the control of blast furnace feeding process, the weight compensation of raw materials, blast furnace line detection and blast furnace data acquisition system. The Institute and the factory more than two years of co-operation until August 1987 5 microcomputer system has been put into operation, including hot-blast furnace combustion control and blast furnace column permeability index test two systems, respectively, in 1986 4 Month and December passed ministerial technical appraisal.