论文部分内容阅读
在现代化矿井设计中,煤仓容量的设计已成为一个难以确定的问题。现从“贮备冗余”最优化的角度,探讨了煤仓容量对矿井连续运输系统可靠度的影响和煤仓容量与运输设备运输能力之间的相互关系。指出了矿井连续运输系统的优化设计,可通过采用“直接寻查法”——矿井采运系统计算机动态模拟来实现。最后举例说明应用矿井采运系统计算机动态模拟的可行性。
In modern mine design, the design of coal bunker capacity has become a difficult issue to be determined. From the perspective of “reserve redundancy” optimization, the influence of coal bunker capacity on the reliability of mine continuous transportation system and the relationship between coal bunker capacity and transportation equipment transportation capacity are discussed. The optimal design of mine continuous transportation system is pointed out, which can be realized through the use of “direct search method” - computer dynamic simulation of mine transportation system. Finally, an example is given to illustrate the feasibility of applying computer dynamic simulation of mine mining system.