按国家”八五”计划和我区社会经济发展的要求,内蒙古西部电网在1995年底又将迈上一个新台阶.其主要表征是:电网最大的机组—达拉特电厂1号、2号机(330MW)相继投产并网运行;第一个并入蒙西电网的百万千瓦级主力厂—丰镇电厂6×220MW容量接入系统;蒙西电网的装机容量达到并超越4000MW,且200MW及以上容量的大机组占全网装机容量的60%;电网主网架(220kV)在充实完善的基础上将出现500kV超
According to the national “Eighth Five-Year Plan” and the requirements of social and economic development in Inner Mongolia, the power grid in western Inner Mongolia will step to a new level by the end of 1995. Its main characteristics are as follows: The largest power generation unit - Dalat Power Plant No. 1 and No. 2 (330MW) have been put into operation in parallel; the first one million kilowatt-class main power plant Mengxi power grid - Fengzhen Power Plant 6 × 220MW capacity access system; Mengxi power grid capacity reached and exceeded 4000MW, and 200MW and The above capacity of large units accounted for 60% of the total installed capacity of the network; grid main grid (220kV) will be enriched in the perfect 500kV