论文部分内容阅读
自五月下旬我局矿山处选矿科制定爱国公约,并讨论了王部长和李局长关于提高质量的报告以来,全科同志都认识到提高质量、提高工作效率的必要性,而且实际行动起来。五月下旬地质调查室交来了二道洋岔645个铜试料,限十天完成化验任务。以我们的分析人员和磨矿设备来说,实在感觉困难。试验室每天如能磨60个试料,还须用十天,化验人员每人每天以最高效率分析60个试料计算,六人还需要10.75天,即516小时。在这种情况
Since the patriotic pact was developed by the Minerals Division of the Bureau of Mines in late May and the report on the improvement of quality by both the Minister Wang and Li has been reviewed, all GPs have realized the necessity of improving the quality and efficiency of work and have actually taken action. In late May, the Geological Survey Office handed over 645 copper samples of Erdaoyangcha and completed the laboratory test within 10 days. With our analysts and grinding equipment, it really felt difficult. It takes 10 days for labs to grind 60 samples daily, and the lab technicians calculate 60 samples per day for the highest efficiency. The six people also need 10.75 days, or 516 hours. In this case