论文部分内容阅读
本规程系根据原电力工业部电力规划设计总院电规计 [1 995 ]1 8号文“关于下达 1 995年度电力勘测设计科研、标准化、信息计划项目的通知” ,由华北电力设计院为主编单位对原电力规划设计管理局批准颁发的《火力发电厂主厂房钢 -混凝土组合结构设计暂行规定》(DLGJ99- 91 )
This regulation is based on the Ministry of Electric Power Planning and Design Institute of Electric Power Planning [1 995] 18 “on the issue of electric power survey and design of scientific research, standardization, information planning project notice” by the North China Electric Power Design Institute for The editor in chief of the former Power Planning and Design Authority approved the issuance of “thermal power plant main plant steel - concrete composite structure design Interim Provisions” (DLGJ99-91)