各位代表、同志们:今天参加这个会,感谢秘书处给我这个机会,很久没来这里(指昆明、编者注)了。这次会议的几个数字,有一定意义:“10”全国水电施工信息网第10次技术交流会;“22”全国水利水电施工技术信息网成立22年;“48”参加会议的代表来自48个单位;“50”会议正逢我们国家50年大庆;“14”会议在十四局召开;“80”会议代表80人我向各位代表介绍三峡工程的建设和管理情况。关于三峡工程的文章和资料很多,各位平时有很多机会了解三峡工程建设的具体情况,今天我将三峡工程的建设和管理情况概括为“一个目标,两个结合,三项控制,四方合作,五大集团”来阐述。1 一个目标—建设三峡开发长江中国长江三峡工程开发总公司自从1993年经国
Dear Delegates, Comrades, Today I attended this meeting, and I thank the Secretariat for giving me this opportunity to come here for a long time. The number of this meeting has some significance: “10 ” National Hydropower Construction Information Network 10th technology exchange meeting; “22 ” National Water Resources and Hydropower Construction Technology Information Network was established 22 years; “48 Representatives of 48 participants attended the meeting; 50 meetings were held in the 50th anniversary of our country; 14 meetings were held in the 14th Bureau; 80 representatives of the meeting 80 delegates I introduced to the delegates the Three Gorges Project construction and management. There are many articles and materials on the Three Gorges Project. You usually have many opportunities to understand the specific conditions of the Three Gorges Project. Today, I generalize the construction and management of the Three Gorges Project as one goal, two combinations, three controls and four parties, Five groups ”to elaborate. A goal - the construction of the Three Gorges Yangtze River China Yangtze River Three Gorges Project Development Corporation since 1993 by the country