英国约克郡的科德·贝克坝的截水墙,有一部分是用喷灌形成的。这样做,英国还是首次。三分之一的截水墙(土坝的东坝肩部位)将采用常规喷灌和板式喷灌相结合的方式来建造。构筑是通过一连串的用板式喷灌按1m中心距、毛直径为1.2m的喷灌柱相连结来实现。
Some of the cutoff walls at the Cod Baker Dam in Yorkshire, England, are sprinkled with water. This is the first time that Britain has done so. One-third of the cutoff wall (the site of the earth dam’s abutment) will be constructed using a combination of conventional and plate sprinkler irrigation. Framing is achieved by a series of sprinkler columns with a 1m center distance and a fur diameter of 1.2m with a series of plate sprinklers.