论文部分内容阅读
初秋的江苏淮北大地,一派生机。田野里秋熟作物郁郁葱葱,长势喜人;京杭运河运输线上,南来北往的船队络绎不绝;从城市到农村人心稳定,社会秩序井然,工农业生产持续发展。这一切简直使人难以置信,一个多月前这儿曾经遭受过严重的大旱。可淮北人民喜笑颜开地说:“大旱之年,是江都抽水站送来了‘救命水’”。江都抽水站建于六、七十年代,包括4座大型泵站33台套机组,装机容量49800千瓦,设计抽水能力400立方米每秒,连同备机达473立方米每秒。该站是江都水利枢纽的主体工程,也是我国目前规模最大的电力排灌工程。江都站的建成,改变了历史上“淮水可用不可靠,长
Huaibei, Jiangsu early autumn earth, a school of life. The autumn crops in the fields are lush and grow in a gratifying manner. The fleet on the Beijing-Hangzhou Grand Canal is moving in an endless stream from south to north. From the city to the countryside, people are in a stable state of mind and the social order is in order. The industrial and agricultural production continues to develop. All this is simply unbelievable and a severe drought hit here more than a month ago. May Huaibei people smiled and said: “The drought year, Jiangdu pumping station has brought ’life-saving water’.” Jiangdu pumping station was built in the sixties and seventies, including four large-scale pumping station 33 sets of units, installed capacity of 49800 kilowatts, the design pumping capacity of 400 cubic meters per second, together with the preparation of up to 473 cubic meters per second. The station is the main project of Jiangdu Water Conservancy Project and also the largest electricity drainage and irrigation project in our country at present. The completion of Jiangdu Station has changed the history of "Huai water available unreliable, long