用强夯方法处理含块石人工填土地基的质量检测,是一项关键程序,若采用单一的岩土工程检测技术,其可靠性低,而采用传统的钻探、载荷试验、标贯和动力触探尽管行之有效,但往往要花费大量的时间并增加工程费用;若采用Rayleigh波检测,其测试技术简单易行,测试信号受环境干扰较小,与传统的检测方法相结合,则能全面、直观和快速地检测强夯含块石人工填土地基的加固处理效果,缩短强夯含块石人工填土地基的检测周期,降低检测成本,提供准确的地基土参数。
Dynamic testing of the quality of embankment-containing artificial fill foundations is a key procedure that uses a single geotechnical test technique that is less reliable than conventional drilling, load testing, standard and dynamic Although it works well, it often takes a lot of time and cost to improve it. If Rayleigh wave detection is used, its testing technology is simple and easy, and the test signal is less disturbed by the environment. Combined with the traditional detection methods, it can Comprehensively, directly and quickly detect the reinforcement effect of the rammed block filled artificial ground, shorten the test cycle of the rammed block filled artificial ground, reduce the testing cost and provide accurate parameters of the subsoil.