论文部分内容阅读
省水利勘测设计院推行全面质量管理(TQC)已于1990年1月通过达标验收,在推行过程中开展质量管理小组活动,已成为攻克技术难关,提高设计质量、水平、效益的有效手段,正日益受到重视,在1991年度全国水利水电勘测设计系统质量管理小组(以下简称QC小组)成果发布会上,我院报送的概算定额修编QC小组成果获部级二等奖。为配合勘测设计单位积极开展QC小组活动,提高成果质量,针对QC小组活动中普遍存
The implementation of Total Quality Management (TQC) by Provincial Water Conservancy Survey and Design Institute passed the acceptance inspection in January 1990, and the quality management team activities in the implementation process have become effective measures to overcome technical difficulties and improve design quality, level and efficiency. In 1991, the Quality Management Team of the National Water and Hydropower Survey and Design System (hereinafter referred to as the QC Team) conference was successfully held. The results of the QC team submitted in our hospital were awarded the second prize at the ministry level. To cooperate with the survey and design unit to actively carry out QC group activities to improve the quality of results for QC group activities in the ubiquitous