1982年8月19日在所领导的关怀下,由科研处负责同志主持,某工程进行了爆炸冲击试验。两位使用单位代表参加了试验。本试验主要考验缓冲系统对设备的保护作用以及机械结构和电路结构的抗冲性能。试验对象是某工程信道和信标接收机。试验装置是200公斤冲击台以及模拟缓冲机架。试验量级最高达1130g。试验程序是垂直、水平、侧向各三锤。试验前后电气性能正常,满足了技术条件的要求。
August 19, 1982 under the leadership of the care by the research department responsible comrades presided over a project conducted an explosion impact test. Two representatives of the participating units took part in the experiment. The main test of the test buffer system for the protection of equipment and mechanical structure and circuit structure of the impact resistance. The test object is an engineering channel and beacon receiver. The test device is a 200 kg impact stand and a simulated buffer rack. Test the highest level up to 1130g. Test procedures are vertical, horizontal, lateral three hammer. Before and after the test electrical performance is normal, to meet the technical requirements.