The main goal of 1B settler is to realize the successful separation of uranium and plutonium. The main aim of this part of study is to meet the decontamination
1 Information of operation SPR is operated for 1 530.217 h in 2004, the reactor’s rated power is 3.5 MW, and the total released energy is 223.157 MW·d. Times
The high-pressure anion-exchange argon-emptying column system was developed for simultaneous separation of plutonium and neptunium from high-level liquid waste