论文部分内容阅读
从 1974年至今 ,契尔克伊水电站已运行了 2 5a。运行期间对水力发电机组、水工建筑物出现的各种安全问题 ,及时进行了研究和解决 ,保证了运行的安全可靠性
Since 1974, the Kırkoy hydroelectric power station has been operating for 2½ years. During the operation of the hydroelectric generating units, hydraulic structures appeared in a variety of safety issues, timely research and solution to ensure the safety and reliability of the operation