论文部分内容阅读
本文结合工程实例,对沉管灌注桩的施工工艺、存在的问题及原因和单桩竖向极限承载力标准值计算等问题进行了介绍和总结。
In this paper, the construction process, the existing problems and reasons of the pipe sinking pile and the calculation of the standard value of the vertical ultimate bearing capacity of the single pile are introduced and summarized with the engineering examples.