论文部分内容阅读
▲大多数发展中国家资金不足,很希望卖主能以BOT方式提供成套设备。《发电成套设备出口,应采取多种灵活方式》介绍了国内外4个水电成套设备项目试用BOT方式的案例,相信其投资回收期的测算和分析能对企业的实践有所启发。
Most developing countries lack of funds, very much hope that the seller can provide complete sets of equipment BOT. “Export of complete sets of power generation equipment should adopt a variety of flexible ways” This paper introduces the trial of BOT cases in 4 hydropower plants at home and abroad. It is believed that the calculation and analysis of the payback period of investment can inspire the practice of enterprises.