论文部分内容阅读
锦江水库位于恩平县大田墟西北,拦河坝为混凝土砌石重力坝,最大坝高63米,坝长345.06米。1958年开始设计动工,砌至坝高17米。1963~1965年单边加高了10米。1970年7月,佛山地区革委会为了进一步落实毛主席关于“备战、备荒、为人民”的伟大战略部署,加速工农业生产的发展,决定动员全区人民大会战,加快完成锦江水电站建设。大坝续建部分改用浆砌石坝,于1972年9月完成。
Jinjiang Reservoir is located in the northwest of Dapu Market in Enping County. The dam is a concrete masonry gravity dam with a maximum height of 63 meters and a length of 345.06 meters. Starting in 1958 to start construction, building to the dam height of 17 meters. 1963 ~ 1965 unilateral increased 10 meters. In July 1970, in order to further implement Chairman Mao’s great strategic plan of “preparing for war, preparing for war and for the people,” the Foshan Revolutionary Committee decided to speed up the development of industrial and agricultural production, decided to mobilize the people’s congress battle in the region and speed up the construction of the Jin Jiang hydropower station. Part of the dam continued to use masonry dam, completed in September 1972.