吉林省火电第二工程公司主要从事大、中型火力发电厂的建筑工程,同时兼营设备安装,是国家火电建筑一级企业。1991~1992年经国家统计局等部门评定,公司列入全国500家最大建筑企业和最佳效益企业。 公司始建于1949年,南征北战40余载,在全国8个省36个市县,建成42座大、中、小型电厂,装机总容量403万kW,锅炉蒸发量18157t/h。特别是近十年,施工能力有较大发展。在此期间,完成了通辽电厂2×20万kW、珲春2×10万kW、吉林2×20万kW、长春热电二厂2×20万kW,计140万kW机组电厂的建筑任务。现正在施工的有双辽4×30万kW、四平三台机组计20万kW、长热一厂三台机组10万kW电厂。 公司拥有固定资产原值7947万元,净值6412万元。其中:用于施工机械设备的原值
Jilin Thermal Power Second Engineering Co., Ltd. is mainly engaged in the construction of large and medium-sized thermal power plants. At the same time, it also operates equipment installation. It is a national thermal power construction company. From 1991 to 1992, it was assessed by the National Bureau of Statistics and other departments. The company was included in the nation’s 500 largest construction companies and the best-benefit companies. The company was founded in 1949. It has been involved in more than 40 years of South Korean campaigns. It has built 42 large, medium and small power plants in 36 cities and counties in 8 provinces across the country, with a total installed capacity of 4.03 million kW and a boiler evaporation capacity of 18,157 t/h. Especially in the past ten years, the construction capacity has been greatly developed. During this period, the construction tasks of the power plants of Tongliang Power Plant 2×200,000 kW, Hunchun 2×100,000 kW, Jilin 2×200,000 kW, Changchun Thermal Power Plant 2×200,000 kW and 1.4 million kW units were completed. Currently under construction are Shuangliao 4×300,000 kW, Siping’s three units totaling 200,000 kW, and Changfeng No. 1 plant’s 100,000 kW power plant. The company has a fixed asset value of 79.47 million yuan and a net value of 64.12 million yuan. Including: original value for construction machinery and equipment