N4SID and MOESP Algorithms to Highlight the Ill-conditioning into Subspace Identification

来源 :International Journal of Automation and Computing | 被引量 : 0次 | 上传用户:guanxming
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
In this paper,an analysis for ill conditioning problem in subspace identifcation method is provided.The subspace identifcation technique presents a satisfactory robustness in the parameter estimation of process model which performs control.As a frst step,the main geometric and mathematical tools used in subspace identifcation are briefly presented.In the second step,the problem of analyzing ill-conditioning matrices in the subspace identifcation method is considered.To illustrate this situation,a simulation study of an example is introduced to show the ill-conditioning in subspace identifcation.Algorithms numerical subspace state space system identifcation(N4SID)and multivariable output error state space model identifcation(MOESP)are considered to study,the parameters estimation while using the induction motor model,in simulation(Matlab environment).Finally,we show the inadequacy of the oblique projection and validate the efectiveness of the orthogonal projection approach which is needed in ill-conditioning;a real application dealing with induction motor parameters estimation has been experimented.The obtained results proved that the algorithm based on orthogonal projection MOESP,overcomes the situation of ill-conditioning in the Hankel s block,and thereby improving the estimation of parameters. In this paper, an analysis for ill conditioning problem in subspace identifcation method is provided. The subspace identifcation technique presents a satisfactory robustness in the parameter estimation of process model which performs control. As a frst step, the main geometric and mathematical tools used in subspace identifcation are briefly presented. In the second step, the problem of analyzing ill-conditioned matrices in the subspace identifcation method is considered. To illustrate this situation, a simulation study of an example is introduced to show the ill-conditioning in subspace identifcation. Algorithms numerical subspace state space system identifcation (N4SID) and multivariable output error error space space model identifcation (MOESP) are considered to study, the parameters estimation while using the induction motor model, in simulation (Matlab environment) .Finally, we show the inadequacy of the oblique projection and validate the efectiveness of the orthogonal projection approach which is need ed in ill-conditioning; a real application dealing with induction motor parameters estimation has been experimented. The obtained results proved that the algorithm based on orthogonal projection MOESP, overcomes the situation of ill-conditioning in the Hankel’s block, and thus improving the estimation of parameters.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
英国是世界上率先迈出电力工业市场化改革第一步的国家之一,其电力工业结构和市场机制自1990年私有化以来,仍始终在不断地发展和改善.本文对英国电力工业第三次大规模改革的
为贯彻落实“三好一满意”活动,社区护理要求护理人员具备较强的业务水平和沟通能力。实践认为,护理人员为社区人群提供服务过程中只有注意仪表仪态,选择礼貌的、积极的语言,专注
A network time-delay compensation method based on time-delay prediction and implicit proportional-integral-based generalized predictive controller(PIGPC) is pro
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
This paper presents an Ethernet based hybrid method for predicting random time-delay in the networked control system.First,db3 wavelet is used to decompose and
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
This paper presents an integrated approach based on dynamic inversion(DI)and active disturbance rejection control(ADRC)to the entry attitude control of a generi