论文部分内容阅读
静乐人民决心提早实现水利化山西静乐县十五万人民决心在半水利化、地埂化的基础上,从“八一”开始,再苦战百日,实现水利化、绿化和梯田化。为了多快好省地完成这一任务,静乐县采取了非常措施:设立了由五个县委委员组成的指挥部,下设由技术干部和土专家组成的技术指导处;开展社会主义大协作;大力进行工具改革,除利用高线运输和打硪机外,运输工具要实现车子化、滚珠轴承化。工程完工后,将使静乐县:渠道纵横,水库棋布。大水不成灾,没雨保丰收,远山高山森林山,村前村后花果山,条条渠道流绿水,荒滩变成米粮川。
The people of Jingle are determined to realize water conservancy ahead of schedule. The 150,000 people in Jingle County in Shanxi Province are determined to start water conservancy, afforestation and terraformization on the basis of “semi-water conservancy and democratization” starting from “August 1” and fighting bitterly for 100 days. In order to accomplish this task in a quicker and more efficient manner, Jingle County adopted extraordinary measures: the establishment of a command post composed of five county committee members and the establishment of technical guidance divisions consisting of technical cadres and indigenous experts; and the implementation of major socialist cooperatives ; Vigorously carry out the tool reform, in addition to the use of high-speed transport and fight machine, transport vehicles to achieve the car, ball bearings. After the completion of the project, will make Jingle County: vertical and horizontal channels, the reservoir chess cloth. Flood disaster, rain did not harvest, Mountain Mountains mountains, village before the village after Huaguoshan, a canal flow of green water, wasteland into rice grain River.