兰州铁路局管内的包兰线、干武线、兰新线和青藏线、宝中线均穿越戈壁、沙漠、盐滩等地质条件恶劣的地带。流沙埋没线路、堵塞桥涵、道床板结和不匀衡拱车道经常发生,流沙使钢轨及配件加速磨耗、锈蚀严重,极大地威胁着线路畅通和行车安全。为此,自50年代以来,铁路局组织有关科研部门对全局500km沙害严重地段,本着“科研引路,因地制宜,就地取材,因害设防,防治结合,综合治理”的原则,先后进行了大规模的防沙、治沙科学研究和治沙工程施工,流沙基本得到了治理,确保了铁路运输安全畅通。
Lanzhou Railway Administration Bao Lan line, Gan Wu line, Lanxin line and Qinghai-Tibet line, Po central line across the Gobi, desert, Yan Tan and other geological conditions of the harsh zone. Quicksand buried lines, blocking bridges and culverts, roadbed knot and uneven arch lane often occur, quicksand to accelerate the wear of rails and accessories, serious corrosion, which greatly threaten the smooth lines and traffic safety. To this end, since the 1950s, the Railway Administration has organized relevant scientific research departments to conduct a series of surveys on the serious sand damage of 500km in the whole city. In line with the principle of “leading scientific research, guiding measures according to local conditions, obtaining materials on site, combining disaster prevention with prevention and control and comprehensive management” Large-scale sand control, sand control science and sand control project construction, quicksand has been basically managed to ensure the safe and smooth railway transport.