马鞍山钢铁股份有限公司第四炼铁厂于1995年5月16日成立,现有2座2500m~3高炉,其中在建的新2号高炉拟于2003年11月投产。另外,还新建1座850m~3高炉,预计于2004年4月投产。届时,将形成年产生铁500万 t 的生产规模。新1号高炉(2500m~3)于1987年10月18日奠基,1994年4月25日投产,至今已生产9年。回顾这9年来的历程,大体上可分为以下三个阶段:一是艰难的起步阶段。这一阶段,大约历时3年多。新1号高炉投产以后,由于系统不配套,设备缺陷多,加上人员新以及缺乏大型高炉操作经验,造成故障频发,炉况波动大,严重影
The Fourth Iron Works of Maanshan Iron & Steel Co., Ltd. was established on May 16, 1995. It has 2 2500m ~ 3 blast furnaces and the new No. 2 blast furnace under construction is about to be put into operation in November 2003. In addition, a new 850m ~ 3 blast furnace is also planned to be put into operation in April 2004. By then, will produce an annual output of 5 million tons of iron production scale. The new No. 1 blast furnace (2500m ~ 3) was laid on October 18, 1987 and was put into operation on April 25, 1994 and has been produced for 9 years. Recalling the past nine years of history, in general, can be divided into the following three stages: First, the difficult initial stage. This phase, lasted about 3 years. After the new No. 1 blast furnace put into operation, due to the system is not complete, equipment defects, coupled with new staff and lack of experience in large blast furnace operation, resulting in frequent failures, fluctuations in furnace conditions, severe shadow