论文部分内容阅读
在党的以农业为基础的方针指导下,1960年下半年,我省为了加强县医院的建设,支援农业生产,根据保证质量、节约材料,因地制宜就地取材的原则,我们在束鹿县300床位医院的设计中,采用了预制砖砌筒壳结构,并将原蒸汽采暖修改为土热风采暖。初步计算(总建筑面积共7,641平方米),与原设计的捣制钢筋混凝土梁板结构、蒸汽采暖方式相比较,共节约钢材61.66吨,占总
Under the guidance of the party’s agriculture-based policy, in the second half of 1960, our province supported the agricultural production in order to strengthen the construction of county hospitals. Based on the principle of ensuring quality, saving materials, and adapting local conditions to local conditions, we are in Shulu County 300. In the hospital design of the bed, a prefabricated brick shell structure was adopted, and the original steam heating was modified to warm earth air heating. Preliminary calculations (a total of 7,641 square meters of gross floor area) compared with the original design of reinforced concrete slab structure and steam heating methods, a total of 61.66 tons of steel was saved, accounting for a total of