通过对井巷工程和主副井交替装备矛盾线的对比分析,主副井交替装备是矿井建设的主要矛盾线,优化主副井装备方案,利用永久井架打井,达到缩短矿井建设工期的目的,以实现矿业集团提出的2000年底前出煤投产的建设目标。
Through the comparative analysis of the pit laneways and the alternate arrangement of main and auxiliary wells with contradiction lines, the alternate equipment of main and auxiliary wells is the main contradiction line of mine construction, the optimization of main and auxiliary shaft equipment plan and the use of permanent derrick for drilling wells can shorten the construction period of mines , In order to achieve the mining group’s goal of putting coal into operation before the end of 2000.