论文部分内容阅读
打通燕郊与北京快速连接的控制性关键工程潮白河特大桥于2015年5月1日正式开工建设。徐尹路(燕郊段)潮白河特大桥是徐尹路二期道路工程的一部分,徐尹路二期设计起点为东六环西侧路,经北京城市干路与东五环、东四环相通,向东与燕郊高新区燕顺路、北外环路、迎宾路等路网连接。徐尹路全线建成后,将成为连接京冀之间的又一条新的交通要道,潮白河特大桥将成为京冀对接的标志
The key control project to establish a rapid connection between Yanjiao and Beijing Chaobai River Bridge was officially started construction on May 1, 2015. Xuyin Road (Yanjiao Section) Chaobai River Bridge is a part of Xuyin Road Phase II. The design of the second phase of Xuyin Road starts from the west side of East Sixth Ring Road. It is connected with East Fifth Ring Road and East Fourth Ring Road via the Beijing urban trunk road, High-tech Zone Yan Shun Road, North Outer Ring Road, Yingbin Road and other road network connections. Upon completion of all the roads in Xuyin Road, it will become another new thoroughfare connecting Beijing and Ji and the Chaobai River Bridge will become the symbol of Beijing-Hebei docking