水利工程管理水平的高低关系着工程效益的大小。联系近年来的工作实践,笔者认为:当前农村水利管理工作面临着阶段性转移。一、基层管理工作不适应已成为水利事业发展的制约因素之一。就基层水利工作而言,当前存在的问题都和管理工作有着十分密切的联系。以山西晋中为例,可窥见一斑。1.水地面积大幅度下降,群众戏称为“新增旱地”。进入80年代以来,每年平均以1.5万亩的速度锐减,在诸多因素中,管理不善最为突出。
The level of water conservancy project management is related to the size of project benefits. Contact with the work practice in recent years, I believe that: the current rural water conservancy management is facing a phased shift. First, the grass-roots management does not adapt to the work has become a water conservancy development constraints one of the factors. As for grassroots water conservancy work, the existing problems are closely related to the management work. Shanxi Jinzhong, for example, can be glimpsed. 1. The area of water area dropped drastically, and the masses dubbed “new dry land”. Since entering the 1980s, the annual average has dropped sharply at the rate of 15,000 mu. Among many factors, mismanagement is the most prominent.