恩施大龙潭水利枢纽于1995年5月完成环境影响评价,2003年8月开工建设,2006年5月建成投入使用,2006年10月进行竣工环保验收,验收审查时专家组发现,大坝下游至清江与带水河汇入口约700 m清江江段出现脱水现象,环保主管部门提出通过技术改造使大龙潭水利枢纽直接释放生态流量至电站坝下游,通过技术经济论证,大龙潭水利枢纽工程实施在水库大坝左岸8#坝段,将一处原用于龙凤坝自来水供给的预留管道口管道上追加连接一根长107 m直径为1.4 m的管道,将大坝上游的水引至左岸导流洞,在导流洞出口处安装一台1 600 kW小机组发电将出水直接放坝下游清江,使该河段电站坝下游脱水状态得到了恢复,经济和环境效益明显。
Enshi Dalongtan Hydraulic Complex completed its environmental impact assessment in May 1995, started construction in August 2003, completed and put into use in May 2006, completed environmental acceptance inspection and acceptance inspection in October 2006, and the expert team found that downstream from dam to Dewatering occurs in the Qingjiang section of Qingjiang River with a water intake of about 700 m, and the environmental protection department proposes that the Grand Longtan Project directly release the ecological flow to the downstream of the power station dam through technological transformation. Through the technical and economic justification, the implementation of the project of the Longtantan hydroelectric project In the 8 # section on the left bank of the dam, an additional pipe length of 107 m and a diameter of 1.4 m was added to a reserved pipe mouth pipe originally used for the supply of tap water in Longfengba Dam, leading the water upstream of the dam to the left bank diversion The installation of a small unit of 1 600 kW at the outlet of the diversion tunnel will directly release the effluent to the Qingjiang River downstream of the dam to restore the dehydration state downstream of the power station dam with obvious economic and environmental benefits.