论文部分内容阅读
当今世界抽水蓄能发电电站发展很快,已有500座以上投入运行。蓄能发电机组也正在向着大容量,高水头、高转速方向发展。水头高达800m级、容量高达400MW级的机组正在开发之中。建造这种电站多数处于内陆地区,要求站址具有上部蓄水水库和下部调节水库,条件较好地具有上部蓄水水库和下部调节水库。条件较好的地点已被开发,
Today’s world pumped storage power station developed rapidly, more than 500 have been put into operation. Energy storage generating units are also moving towards large capacity, high head, high speed direction. Heads up to 800m and capacity up to 400MW are under development. The majority of the construction of such power plants is in the inland area, requiring that the site be provided with an upper reservoir and a lower regulated reservoir, preferably with an upper reservoir and a lower regulated reservoir. Better conditions have been developed,