烟囱采用滑模施工在质量和进度上显示了较多的优越性,避免了搭拆竖井架所必不可少的繁重而危险的高空作业,为烟囱工程施工机械化、提高劳动生产率开创了新途径,但也存在三个突出的技术难题:①滑模结构的扭转;②滑模平台的水平漂移;③滑模平台不同步滑升。这三个问题影响了烟囱几何尺寸的精度和混凝土出模质量,同时严重影响了滑模施工进度,使滑模工艺潜在的经济效益发挥不
The construction of the chimney using sliding mode shows more advantages in terms of quality and progress, avoiding the heavy and dangerous work-at-height that is necessary for the erection of the vertical mast, creating a new way for the mechanization of the chimney construction and increasing the labor productivity. However, there are also three prominent technical problems: 1 the torsion of the sliding mode structure; 2 the horizontal drift of the sliding mode platform; 3 the sliding mode platform slips out of sync. These three problems affect the accuracy of the geometry of the chimney and the quality of the concrete, and at the same time seriously affect the construction progress of the sliding mode, so that the potential economic benefits of the sliding mode process do not play a role.