问题的提出宝珠寺水电站位于四川省广元县三堆坝附近,离宝成铁路昭化站18公里,是白龙江干流第二个梯级电站。水电站枢纽采用混凝土重力坝,最大坝高130米,坝址白龙江平水位487米,设计蓄水位588米,最大库容25.4亿立米,电站装机容量64万千瓦,年发电量22.78亿度,是以发电为主,兼有灌溉、防洪等综合效益的大型水利枢纽工程。
PROBLEM PROBLEM Baozhusi Hydropower Station is located near San Daba in Guangyuan County, Sichuan Province, 18 km away from Baocheng Railway Zhahua Station, and is the second cascade power station in Bailongjiang. Hydropower Station hub using concrete gravity dam, the maximum dam height of 130 meters, the Bailongjiang dam water level of 487 meters, designed water level of 588 meters, the maximum storage capacity of 2.54 billion cubic meters, power station installed capacity of 640000 kilowatts, the annual generating capacity of 2.278 billion degrees, so Power generation, both irrigation and flood control and other comprehensive benefits of large-scale water control project.