绥德水土保持工作推广站目前进行的水土保持试验研究工作的内容共有四项:(一)水土保持基本试验;(二)综合性土地利用试验;(三)水土流失观测;(四)土坝测验。均于一九五三年春季开始分别在韭园沟与辛店沟两个基点进行,玆将试验研究工作进行情况与初步取得成果报告如下:
Suide Soil and Water Conservation Works Extension Station soil and water conservation research work carried out at present the contents of a total of four: (A) basic test of soil and water conservation; (B) comprehensive land use test; (C) soil erosion observation; (D) earth dam test. Both at the two base points of Jiuyuangou and Xindian ditch respectively in the spring of 1953. The progress made in the pilot studies and the preliminary achievements made are reported as follows: