河套灌区总干渠第二分水枢纽新建水电站可行性分析

来源 :内蒙古水利 | 被引量 : 0次 | 上传用户:beyondzcy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
对在河套灌区总干渠第二分水枢纽上新建水电站进行了可行性分析。根据节制闸上下游水位和过闸流量条件初步选择了水电站装机和机型 ;由枢纽现有建筑物布置选择了电站布设、建筑物选型和明渠、管道尺寸 ;重点对建电站进行了财务经济分析 ,并作出评价结论 ,指出财务经济方面也是可行的 ;对资金来源和管理运行作了初步探讨 The feasibility analysis of new hydropower station on the second water diversion hub of main canal of Hetao Irrigation District was carried out. According to the upstream and downstream of the gate and the water level and over the gate flow conditions initially selected hydropower station installed capacity and model; the layout of the existing buildings selected by the hub station layout, building selection and open channel, pipe size; focus on the construction of power station finance and economics Analysis, and make the conclusion of the assessment, pointing out that the financial and economic aspects are also feasible; the sources of funds and the operation of the management made a preliminary discussion
其他文献
该文的第一章导论部分从对外开放与国际竞争、自由贸易与国际竞争的关系入手,指出国际竞争的核心是产业国际竞争力,并且分析了中国产业面临的国际竞争态势.第二章中对产业国
文章针对“十一五”期间我区水利科技发展及管理体制与机制不完善问题,分析探索提出内蒙古水利科技创新模式,为新时期水利事业的改革发展提供强有力的科技支撑。 In order t
校企产学研深度合作是有利于高技能应用型人才的培养.产学研合作是以市场为纽带,以互利互惠为最终原则,把企业生产、院校教学、科研紧密结合,发挥其各自优势,弥补不足,形成产
在我国构建终身教育体系和建设学习型社会的进程中,社区教育已日益成为一种区域性全民终身教育.随着高等教育大众化的进一步发展,为社区教育的发展提供了有利的条件和良好的
命题是一项科学性和技术性很强的工作,它直接影响着教学。如何提高义务教育阶段初中语文学业水平考试或检测的命题质量,让命题发挥正向引导作用,本文试从以下方面进行探讨。
该文第一章介绍了该文研究问题的背景、现状,研究的主要内容和意义,以及该文的框架结构与技术路线,勾勒出该文的基本轮廓.第二章是对商业银行的全面认识,从商业银行的产生发
由于农村教师自身条件和所处环境的差异,对于新课改的理解程度和把握尺度也不尽相同。怎样提高语文课堂教学的水平,使课堂教学真实高效,是我们广大语文教师的心声。笔者结合
陶行知是我国伟大的教育家,思想家,他一生提出了很多教育思想,为后人留下了宝贵的财富.陶先生以实践第一的观点,倡导了“生活即教育,社会即学校,教学做合一”的生活教育理论.
全要素生产率是各种生产要素的综合生产效率,它与单要素生产率不同,二次大战之前,西方国家多核算劳动生产率;我国在长期的统计实践和经济管理中所采用的生产率指标都是单要素生产