论文部分内容阅读
对在河套灌区总干渠第二分水枢纽上新建水电站进行了可行性分析。根据节制闸上下游水位和过闸流量条件初步选择了水电站装机和机型 ;由枢纽现有建筑物布置选择了电站布设、建筑物选型和明渠、管道尺寸 ;重点对建电站进行了财务经济分析 ,并作出评价结论 ,指出财务经济方面也是可行的 ;对资金来源和管理运行作了初步探讨
The feasibility analysis of new hydropower station on the second water diversion hub of main canal of Hetao Irrigation District was carried out. According to the upstream and downstream of the gate and the water level and over the gate flow conditions initially selected hydropower station installed capacity and model; the layout of the existing buildings selected by the hub station layout, building selection and open channel, pipe size; focus on the construction of power station finance and economics Analysis, and make the conclusion of the assessment, pointing out that the financial and economic aspects are also feasible; the sources of funds and the operation of the management made a preliminary discussion