国家电网公司正在进行用电信息采集系统(以下简称采集系统)的建设工作,预计2014年将全面实现“全采集、全覆盖、全预付费”。其中,智能电能表的采集成功率是采集系统深化应用首先需要解决的问题。各省电力公司在提升采集成功率方面,一般采用终端厂家和智能电能表厂家,甚至是载波芯片厂家进行现场支持的方式进行解决,但往往会出现厂家之间互相推诿责任的情况,无法判断问题所在
State Grid Corporation of China is carrying out the construction of the electricity information collection system (hereinafter referred to as the acquisition system) and is expected to fully realize “full acquisition, full coverage and full prepayment” in 2014. Among them, the acquisition success rate of smart meters is the first problem to be solved in deepening the application of the acquisition system. Provincial power companies in improving the success rate of acquisition, the general use of terminal manufacturers and smart meter manufacturers, or even carrier chip manufacturers on-site support for the way to solve, but often there will be between manufacturers push each other’s responsibility, can not determine the problem