根据最近的检查,本厂存在着普遍的和严重的积压浪费现象,据初步计算达1000万元以上。积压浪费的严重,首先表现在经营管理上的混乱和定额资金计划的极端保守上。占全部定额资金90%的材料储备资金与生产资金的占用额,平均降低年计划草案的13.1%,但是,根据检查与摸底后拟修订的定额来看,还可减少原计划的26.5%,也就是说表面上是降低了而实际上是浪费了312万元的国家资金。正因为定額资金计划的保守性这样大,因此,就更加
According to the recent inspection, the factory there is a widespread and serious backlog of waste, according to preliminary calculations of more than 10 million yuan. The serious backlog of waste was first manifested in the extreme conservativeness of chaos in management and the planned capital plan. Accounting for 90% of the total fixed capital reserves of materials and production funds, the average annual reduction of 13.1% of the draft plan, but according to the examination and after the end of the proposed fixed quota point of view, you can also reduce the original plan of 26.5%, also That is to say it is reduced on the surface but is actually wasted 312 million yuan of state funds. It is precisely because the conservative nature of the quota capital plan is so large that it is even greater