论文部分内容阅读
串列加速器安全技术改造是从2008年9月开始实施的,2009年10月完成竣工验收。主要包括串列加速器辐射防护、供电与照明、实体保卫、火灾报警、水暖、排风及工业电视监控等方面的安全技术改造,目前设备运行状态良好。1HI-13串列加速器辐射防护联锁与剂量监测系统安全改造HI-13串列加速器实验室主要由加速器大厅与3个实验厅组成。辐射防护联锁系统的主要作用是给出各个工作区域工作状态指示,控制人员在这些区域的出入权,具有自动保护功能,必要时还
Tandem accelerator safety technology transformation is implemented from September 2008, completed in October 2009 acceptance. Mainly include tandem accelerator radiation protection, power supply and lighting, physical security, fire alarm, plumbing, ventilation and industrial television monitoring and other aspects of safety technology transformation, the current equipment running in good condition. 1HI-13 Tandem Accelerator Radiation Protection Interlocking and Dosage Monitoring System Safety Modification The HI-13 Tandem Accelerator Laboratory consists of an accelerator hall and three laboratories. Radiation protection interlocking system's main role is to give instructions for the working status of each work area, control access to these areas, with automatic protection, if necessary