论文部分内容阅读
为解决四川省二滩水电站木材过坝进口段过木通道端部木材堵塞的问题,进行了拆垛用立柱式滚筒的模型设计和相应的试验,采用这样的措施可以解决这类堵塞的问题
In order to solve the problem of blockage of wood at the end of timber passing through the dam of Ertan Hydropower Station in Sichuan Province, the model design and the corresponding experiment of column cylinder for disassembling are carried out. Such measures can solve the problem of such blockage