论文部分内容阅读
“六五”期间,淮河流域四省经过勘测设计人员的辛勤劳动,在治淮工程的规划设计方面做了大量的工作,编报了不同阶段的规划、设计文件,基本上满足了治淮工程建设的需要,并为后续阶段的工作打下了基础。各省在布署和进行规划设计工作时,还积累了不少经验。回顾前几年的工作,我们感到治淮工程的规划、设计工作还存在一些问题,主要是:(一)规划、设计文件质量不高,深度不够;(二)编报和审批的进度不快,赶不上工程建设的需要。在质量方面,有的可行性研究报告没有重视作多方案比较,对工程的替代方案和影响工程的补偿措施缺乏必要的分析计算,以至方案的可行性和必要性经不起推敲;有的设计文件对采用的水文数据未加分析和叙述,对工程的地质条件和料场情况没有认真查清;有的枢纽布置未作比
During the period of the Sixth Five-Year Plan, a great deal of work has been done in the planning and design of the Huaihe River Huaihe River Basin through the hard work of the surveyors and designers. Four stages of planning and design documents have been compiled and reported, basically meeting the requirements of the Huaihe River Poverty Alleviation Project Construction needs, and lay the foundation for the work of the follow-up phase. The provinces also accumulated a great deal of experience in deploying and carrying out planning and design work. Looking back on the work of previous years, we feel that there are still some problems in the planning and design of the Huaihe River engineering. The main problems are: (1) the quality of planning and design documents is not high enough and the depth is not sufficient; (2) the pace of preparation and approval is not satisfactory, Can not keep up the construction needs. In terms of quality, some feasibility studies fail to emphasize the comparison of multiple programs. The lack of necessary analysis and calculation of alternatives to projects and compensation measures affecting the projects lacks scrutiny of the feasibility and necessity of programs. Some designs The hydrological data used in the document have not been analyzed and narrated, and the geological conditions of the project and the site conditions have not been carefully checked; some hub layouts are not compared