结合日益快速发展的抽水蓄能电站建设,从施工期的施工组织设计角度,分析目前抽水蓄能电站建设过程中地下厂房安全通道设置面临的困难,以浙江仙居抽水蓄能电站为例,着重阐述了基建期地下厂房安全通道布设的方案,为进一步优化抽水蓄能电站地下厂房基建期安全通道布设提供参考。
Combined with the construction of pumped storage power station that is growing rapidly, from the perspective of construction organization and design during the construction period, the difficulties in setting up the safe passage of underground powerhouse during the construction of pumped storage power station are analyzed. Taking Zhejiang Xianju Pumped Storage Power Station as an example, The scheme of safe passage layout for the underground powerhouse during the construction period is expounded, which provides reference for further optimizing the layout of the safe passage during the construction period of underground powerhouse of pumped storage power station.