百米回转窑快速优质砌砖

来源 :工业建筑 | 被引量 : 0次 | 上传用户:hngyssh
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
某厂φ4×100米迴转窑,用六天的时间全部完成了161立方米内衬耐火砖砌筑任务,取得了同型窑体快速砌砖的初步经验。廻转窑是否能按时全歼,是决定某厂能否按时投产的重要关键。这座窑体的砌砖工程是在一九六四年的最末一旬里施工,面临着时间短、工作量大和低温季节,并处于窄小有限的工作面上施工。在这种客观形势的要 A φ4×100-meter rotary kiln of a certain factory completed the task of lining refractory bricks within 161 cubic meters in six days, and achieved initial experience of rapid bricklaying in the same kiln. Whether or not the rotary kiln can be fully unloaded on time is an important factor in determining whether a plant can be put into production on time. The brickwork of this kiln was constructed in the last ten days of 1964. It was faced with short time, heavy workload and low temperature season, and was constructed on a narrow and limited working surface. In this kind of objective situation
其他文献
在3302厂设计中的废汽利用系统为:水压机与汽锤之废汽,分别经两组机械的填料收容装置与油分离装置,送到废汽蓄汽器中;然后,直接以处理后的废汽供给锻压、铸钢等五个车间之采
目前在多层框架房屋的动力计算中,一般不考虑空间刚度的影响,有关实测分析表明,当房屋两个主轴方向尺寸相差较大,而房屋的楼板刚度较小时,楼板变形是不能忽略的,因此,在动力
最近,八冶某工地施工了六个粉矿仓。粉矿仓是直径12米,高12.43米的钢筋混凝土圆罐。仓壁厚度270毫米。壁内配有直径10毫米、间距200毫米的立筋和直径12毫米、同距150毫米的
中国模板工程协会于一九八四年五月二十九日至三十一日在北京召开成立大会。参加会议的有国家计委施工局和中国施工企业管理协会的负责同志、施工企业和钢模板厂的会员代表,
化学灌溉是指在现有的灌溉系统中附加一些简单的设置以及技术上的适当改动,把化肥和农药的使用结合到灌溉系统上去,通过灌溉来施用化肥和农药。由于这种方法的针对性很强,因此,化
从师范毕业踏入学校大门起,我就一直安安心心教书,本本分分做人,想着这辈子将和大多数教师一样,会兢兢业业一辈子,安安稳稳到退休吧。但当我无意中发现一本书《一个教师到底
胡耀邦总书记于4月3日在洛阳接见洛阳玻璃厂负责人时,关心玻璃的质量问题。胡耀邦同志指出,玻璃工业的发展要加快速度,推动企业技术进步,提高玻璃质量,进入国际市场。胡耀邦
对煤斗采用现浇混凝土的施工方法,一直是被施工人员视作一个疑难问题,它主要难在模板的安装及支撑上。由于煤斗本身结构荷载上的特点,加上施工工作面小而形成施工荷载的高度
十三冶二公司砌筑45米高的砖烟囱,是用外脚手悬吊工作台施工的,操作既方便又安全。悬吊工作台由四层单排脚手架粗成(图17),在靠烟囱周边的一排脚手架四角上,吊挂四个1.5吨的
1 1946年年底,东北合江、牡丹江地区的大股土匪谢文东、李华堂、张黑子(张雨新)、王枝林、马喜山等基本上都被我军剿灭了,但小股土匪还有一些。入冬以来,牡丹江军区二团对国