石油部的抗震加固工作开始于1977年,到1984年底已完成加固面积六百五十一万平方米。占需加固量的百分之九十九。他们在工作中采取两先两后的步骤(先中期地震预报地区,后一般地区;先建筑物加固,后设备加固),坚持上下结合、内外结合、专群结合的工作方法。对所有加固工程做到有鉴定报告、加固图纸、施工记录、档案资料及
The anti-seismic reinforcement work of the Ministry of Petroleum began in 1977. By the end of 1984, the reinforced area had been completed by 6.51 million square meters. This accounts for 99% of the amount of reinforcement required. In their work, they take the first two steps (early and medium-term earthquake prediction area, the latter general area; the first building reinforcement, and later equipment reinforcement), and adhere to the upper and lower integration, internal and external integration, special group work methods. For all reinforcement projects, there are identification reports, reinforcement drawings, construction records, and file information.