二号坑、230斜井为海南山金主要生产区域,两个生产区域相距5.5公里,井下最短运输线路也长达2200米,受原始森林及山路的影响,南北矿区交通及通讯一直不是很畅通,矿山测量系统也处于两个相对独立的系统中。这给测量贯通工作带来了很大的难题,在测量技术组的多次探索研究下终于攻破难题,解决了两个生产区域坐标系统统一的难题。本次贯通工程属于多级斜井、平巷(其中包含580米的破碎带大断层)组成的联合型开拓工程。
No. 2 pit and No. 230 inclined well are the main production areas of Hainan Gold. The two production areas are 5.5 km apart. The shortest underground transportation routes are also up to 2,200 meters. Due to the impact of primary forests and mountain roads, traffic and communications between North and South mining areas have not been very smooth , Mine measurement system is also in two relatively independent systems. This has brought great challenges to the measurement of through-work. After many exploration and study of the measurement technology group, it finally solved the problem and solved the problem of the unification of the coordinate systems in the two production areas. This through-project belongs to the multi-level inclined shaft, lane (which contains a 580-meter broken belt fault) composed of joint-type pioneering project.