论文部分内容阅读
文章对于土坝在修建的过程中所遇到的问题进行了针对性探讨,并且对于主要的坝内涵洞所需要的封印填堵方式进行了方案设计,结合实际的情况进行了加固处理的方式,还结合了当前最为先进的混凝土方式来增加效果。
This paper discusses the problems encountered during the construction of earth dam and probes into the design of the sealing and plugging methods needed for the main dam culverts and the method of reinforcement treatment according to the actual conditions. It also combines the most advanced concrete methods to increase the effect.