住友金属工业公司和歌山钢厂现有四套小型烧结设备投产,但因其设备老化劳动生产率低,维修费高,加之2号烧结设备没有废热回收装置,能源费用也高。为了扭转这种局面,进行了如下改进: (1)为了提高产量,回收中压蒸汽,采用烧结带后半部冷却的方法。延长烧结机卸料侧的长度。采用现存的一台主抽风机,增设两台新循环风机。表1列出4号烧结设备改造前
Sumitomo Metal Industries Wakayama existing four sets of small-scale sintering plant put into operation, but because of its aging equipment, low labor productivity, high maintenance costs, combined with No. 2 sintering equipment without waste heat recovery unit, energy costs are high. In order to reverse this situation, the following improvements have been made: (1) In order to increase the output, medium-pressure steam is recovered and the latter half of the sintering belt is cooled. Extend the discharge side of the sintering machine length. The use of an existing main exhaust fan, additional two new circulation fan. Table 1 lists the No. 4 sintering equipment before the transformation