论文部分内容阅读
电力工业部水力发电建设总局地质勘测考察组一行五人,于1981年1月5日至27日赴美进行了技术考察。考察期间,先后访问了加利福尼亚州水资源局、内务部水和动力资源局所属的丹佛工程和研究中心、陆军工程师团维克斯堡水道试验站和吉尔伯特公司等有关部门;考察了渥洛维尔坝(土石坝,坝高226米,地下厂房,装机容量64.4万千瓦)、奥本坝(原设计为高209米的拱坝,现已停建)和在建的温泉坝(土石坝,坝高97米)。此外,还参观了美国工程地质工程师学会地质技术部在旧金山举办的勘测仪器设备展
Ministry of Electric Power Industry Hydroelectric Power Construction Bureau geological survey team of five, January 5, 1981 to 27 in the United States conducted a technical inspection. During the visit, he visited the California Department of Water Resources, the Ministry of the Interior Water and Power Resources Denver Engineering and Research Center, the Army Engineer Vickers Waterworks Test Station and Gilbert company and other relevant departments; Weirba dam (226 meters high, underground plant, installed capacity of 644,000 kilowatts), Auburn dam (originally designed to be 209 meters high arch dam has been stopped) and the construction of hot springs dam (earth dam, Dam high 97 meters). In addition, the Institute of Geology and Engineering of the United States also visited the survey equipment and equipment exhibition held in San Francisco