论文部分内容阅读
兖州站管辖兖州客站和兖州北站,是津浦线和新乡—兖州—石臼所交叉处的枢纽区段站。改革开放以来,运量急剧上升,该站能力已处于饱和状态。按1988年“4.1”实行的新运行图,上行场到发线通过能力利用率按计算能力算已到0.97,改编能力利用率按无调比推算为1.08,菏泽南分界口要增加4~6对货物列车,为此,提高兖州地区通过能力,是急待解决的问题。
Yanzhou Railway Station Yanzhou station and Yanzhou North Railway Station, is Jinpu Line and Xinxiang - Yanzhou - Shijiu intersection at the hub section station. Since the reform and opening up, the volume of transportation has risen sharply, and the capacity of this station has been saturated. According to the new operation chart of “4.1” in 1988, the upstream line to the hairline has been calculated to 0.97 by capacity utilization capacity, and the utilization rate of adaptation capacity has been adjusted to 1.08 at no-cost ratio, with an increase of 4 to 6 Train cargo, therefore, to improve the capacity of Yanzhou area is an urgent issue to be solved.