1961年~1963年我省相继在沈旅线0~13公里、94~99公里,沈本线0~3公里的现有黑色路面上进行表面处治。根据这三段路面的施工及通事后的情况,现提出以下几点体会。一、旧路面修整旧有路面,路况较差。为了做好新的表面处治层,我们采取以下的处理方法: (一)补坑槽旧有黑色路面,经大部分系双层表面处治,也有小部分系6厘米贯入式路面,因年久失养,造成路面坑槽连片,且深度不一,破坏情况不一。根据坑槽的大小情况,分别采取以下几种修补坑槽的方法: 1.6厘米深度或深于6厘米的坑槽,根据坑槽面
From 1961 to 1963, the province successively treated surface on the existing black road surface of 0 ~ 13 km, 94 ~ 99 km and 0 ~ 3 km of Shenben Line. According to the construction of the three sections of pavement and the situation after the incident, the following points are put forward. First, the old pavement trimming the old pavement, poor road conditions. In order to do a good job of new surface treatment, we take the following approach: (A) fill the pit of the old black pavement, the majority of double-layer surface treatment, but also a small part of 6 cm penetration of the road, as a long time Loss of support, resulting in contiguous road pit, and the depth of different damage in different situations. According to the size of the pit, the following methods are used to repair pit: 1.6 cm deep or deeper than 6 cm pit, according to the pit surface