一、工长要求电工工长请注意;施工程序要牢记。设计图纸为依据,认真看图提问题。交叉施工多变化,规范标准须熟记。施工之前先交底,材料计划应早提;文明施工排在前,安全生产列首位;技术措施要得力,质量保证有体系;样板做法要推广,质量推行 T.Q.C;先进科技要采用,操作要用新工艺。材料设备先检验,记录表格填详细;产品要有合格证,检验证书要备齐。二、施工准备
First, the foreman asks the electrician foreman to pay attention; the construction procedure must be kept in mind. Based on the design drawings, seriously look at the problem. Cross-construction is subject to change, and standard specifications must be memorized. Before construction, the materials plan should be referred to as early as possible; the civilized construction ranks first; the safety production ranks first; the technical measures are effective; the quality assurance system; the model practice should be promoted; the quality should be TQC; advanced technology must be adopted; Process. The materials and equipment shall be inspected first, and the record form shall be filled in in detail; the product shall have a certificate of conformity and the inspection certificate shall be prepared. Second, the construction preparation